
Upper Tamakoshi HEP
- Location
- Dolakha, Nepal
- Capacity
- 456 MW
- Technology partner
- Andritz Hydro

Six engineering practice areas. Fifty years of delivery across Nepal's power and infrastructure landscape.
Complete water-to-wire electromechanical packages for utility-scale plants: turbines, generators and balance of plant, delivered with leading OEMs and commissioned on site by our engineers.






Substations up to 400 kV, transmission lines and grid interfaces delivered to national standards, connecting new generation to the load centres that need it.








Sourcing, import and after-sales support for critical plant equipment: generators, elevators, batteries and process machinery for industry, hospitals and institutions.
Feasibility, design review, tender preparation and delivery oversight. A Nepal-experienced engineering counterpart who reads both international standards and local site reality.






Global procurement, freight and customs clearance backed by in-country distribution. Heavy equipment moves from port to site on installation-window schedules.
Through Trade Link Global we develop, invest in and operate hydropower assets, carrying our supply-side experience into ownership of future generation capacity.






Upper Tamakoshi Dam

Turbine Hall Erection

132 kV Switchyard

Transformer Heavy Lift

Plant Control Room

Site Supervision

Industrial Plant Supply
